Pre-Installation
Before you begin installation, remember to P.A.C.E. yourself with the checklist below.
P.A.C.E. Pre-Installation Checklist
- Prepare Job Site
- Acclimation
- Control Subfloor Moisture
- Environmental Conditions
Acclimation & Environment
48 hours minimum acclimation. Temperature 65°F–85°F, humidity 35%–65% during installation and year-round. HVAC must be running.
Subfloor Requirements
- Flat, clean, dry. Max 3/16" variation over 10 feet.
- Wood: Securely fastened, moisture ≤ 13%
- Concrete: Fully cured (60+ days). Moisture barrier required.
Underlayment & Expansion
Quality underlayment required. On concrete, use moisture barrier underneath. Leave 1/4" to 3/8" expansion gap around all walls and fixed objects.
Floating Click-Lock Installation
Installation Steps
Step 1: Install underlayment. Tape all seams.
Step 2: Measure room. Ensure last row ≥ 2-1/2" wide.
Step 3: Begin along longest wall with spacers. Cut tongue off first row.
Step 4: Connect planks by angling and clicking. Stagger end joints by at least 12".
Step 5: Use tapping block and rubber mallet to engage. Never strike directly.
Step 6: Rip final row to width. Remove spacers and install trim.
Care & Maintenance
- Sweep or vacuum regularly. Damp mop with laminate-specific cleaner.
- Do NOT use wet mops, steam mops, or excessive water — laminate is NOT waterproof.
- Wipe up spills immediately. Use felt pads under furniture.
- Maintain temperature 65°F–85°F, humidity 35%–65%.
Need Professional Installation?
Our expert installers serve all of Central Florida with up to 5 years warranty coverage.