Vinyl Select & Select XL Flooring Installation Guide

Vinyl Select & Select XL Flooring Installation Guide

Everything you need to complete your project like a pro

Vinyl Select & Select XL Flooring Installation Guide PDF Installation Guide
Download PDF

Pre-Installation

Before you begin installation, remember to P.A.C.E. yourself with the checklist below.

P.A.C.E. Pre-Installation Checklist

  • Prepare Job Site
  • Acclimation
  • Control Subfloor Moisture
  • Environmental Conditions
Quick Tip: Cavalieri Select & Select XL vinyl planks feature a rigid SPC core for maximum stability. 100% waterproof with no acclimation required. Score and snap with a utility knife — no power saws needed.

Material Preparation

Order 5% extra for cutting waste and grading. Inspect all planks in daylight before installation. Shuffle planks from several cartons for best color variation. Store cartons flat, max 8 high.

Subfloor Requirements

  • Clean, dry, flat to 3/16" per 10-foot radius
  • Wood: Securely fastened, moisture ≤ 13%
  • Concrete: Fully cured (60+ days). Moisture barrier required. Max 8 lbs calcium chloride or 90% RH
  • Existing floors: Must be well-bonded and level. Fill grout lines
  • Crawl spaces: 6-mil plastic over earth, 18" ventilated air space

Radiant Heat

Compatible with floating installation only. Max surface temp 85°F.

Expansion Gap

Leave 1/4" around all walls and fixed objects. Never nail or screw through a floated floor.

Floating Click-Lock Installation

Installation Steps

Step 1: Measure room width. Ensure final row ≥ 1/3 plank width. Adjust first row if needed.

Step 2: Begin along the longest, straightest wall. Place 1/4" spacers. Cut tongue off first row.

Step 3: Connect planks end-to-end by angling at 20° and pressing down.

Step 4: Cut last plank in each row. Start next row with cut piece if ≥ 8". Stagger joints by 6".

Step 5: Angle new rows into previous at 20° and press to lock.

Step 6: Use rubber mallet and tapping block. Never strike planks directly.

Step 7: Rip final row to width maintaining 1/4" gap.

Step 8: Remove spacers. Install transition moldings and baseboards.

Quick Tip: Select XL planks are wider than standard Select planks. The same installation method applies to both — just ensure proper staggering and expansion gaps for the wider format.

Care & Maintenance

  • Sweep or vacuum regularly with soft-bristle broom or vacuum without beater bar.
  • Damp mop with pH-neutral vinyl cleaner. No steam mops or abrasive cleaners.
  • Wipe up spills promptly. Use felt pads under furniture.
  • Place doormats at entrances. Maintain temperature 60°F–80°F, humidity 35%–55%.
  • Use blinds or curtains to reduce UV exposure.

Need Professional Installation?

Our expert installers serve all of Central Florida with up to 5 years warranty coverage.

SCHEDULE FREE ESTIMATE CALL: (321) 424-0546