Vinyl Plus Flooring Installation Guide

Vinyl Plus Flooring Installation Guide

Everything you need to complete your project like a pro

Vinyl Plus Flooring Installation Guide PDF Installation Guide
Download PDF

Pre-Installation

Before you begin installation, remember to P.A.C.E. yourself with the checklist below.

P.A.C.E. Pre-Installation Checklist

  • Prepare Job Site
  • Acclimation
  • Control Subfloor Moisture
  • Environmental Conditions
Note: The Vinyl Plus collection has been discontinued. This installation guide is for reference with existing purchased product.

Subfloor Requirements

  • Clean, dry, flat to 3/16" per 10-foot radius
  • Wood: Securely fastened, moisture ≤ 13%
  • Concrete: Fully cured (60+ days). Moisture barrier required.

Expansion Gap

Leave 1/4" around all walls and fixed objects. No acclimation required.

Floating Click-Lock Installation

Installation Steps

Step 1: Measure room. Ensure final row ≥ 1/3 plank width.

Step 2: Begin along longest wall with spacers. Cut tongue off first row.

Step 3: Connect planks by angling at 20° and pressing down.

Step 4: Stagger end joints by at least 6". Use cut pieces ≥ 8" as starters.

Step 5: Use rubber mallet and tapping block. Never strike directly.

Step 6: Rip final row. Remove spacers and install trim.

Care & Maintenance

  • Sweep or vacuum regularly. Damp mop with pH-neutral vinyl cleaner.
  • No steam mops or abrasive cleaners. Wipe up spills promptly.
  • Use felt pads under furniture. Maintain temperature 60°F–80°F, humidity 35%–55%.

Need Professional Installation?

Our expert installers serve all of Central Florida with up to 5 years warranty coverage.

SCHEDULE FREE ESTIMATE CALL: (321) 424-0546